Get Adobe Flash player

The Quadra Kong does the job

Beginning of  june the Quadra Kong 'set sail' from the yard of Cape-Holland in Beilen. Destination: The Riffgat!

 

 

The tandem of four APE600 vibrators is deployed to drive the monopile foundations for the Riffgat windfarm as deep as possible with maximum flexibility. Allnamics was involved in assessing the driveability and the required power for this monster task. Friday June 15th the first pile has been installed without any problems by Seaway Heavy Lifting. It is considered as a big success by everyone involved!

Leave a Reply

Your email address will not be published. Required fields are marked *