In April 2016 Allnamics has performed PDA-monitoring and DLT-testing for our client Voorbij Funderingstechniek BV, for the Amstel Towers Hotel near Amstel station in Amsterdam. The tests were done on 51 m long precast concrete piles, driven in sections, with a mechanical joint.

 

PDA monitoring (Pile Driving Analysis) was done during full installation cycles of selected production piles. Main goal of the test was to check the tensile stresses during driving, in particular at the location of the mechanical joint.

 

DLT-monitoring (Dynamic Load Testing) was done during restrike (approx. 10 blows) on piles that had been installed a couple of days earlier. Main goals of this test were to check the strength of pile shaft and joint and the static bearing capacity  of the pile.

 

Both tests were performed with the in-house developed Allnamics PDR-system, fitted with combined strain and acceleration sensors, which were mounted near the pile head. The PDR reads and stores the monitoring data real time and transmits them with a wireless connection (by WiFi) to the field computer of the monitoring engineer. The wireless connection offers great advantages during upending and positioning of the pile and makes it possible for the monitoring engineer to do his monitoring job on a good location, at a safe distance from the pile and without traditional worries about the long cable getting stuck or damaged during handling or piling.

AmstelTowersHotel_Foto_1

Photo 1 : Monitoring with WiFi connection, at a safe distance from the pile

The tests showed that the tension stresses during driving were acceptable and that the available static bearing capacity is sufficient for the design loads of the piles.

AmstelTowersHotel_Foto_2

Photo 2 : no trouble with long cables during upending of the pile

AmstelTowersHotel_Foto_3

Photo 3 : pile and monitoring equipment at end of PDA